logo

Daily Updated Afghan News Service

  • Home
  • About
  • Opinion
  • Links to More News
  • Good Afghan News
  • Poll Results
  • Learn about Islam
  • Learn Dari (Afghan Persian/Farsi)
formats

TAPI Gas Pipeline Through Afghanistan ‘Doable’

9th April, 2016 · admin

asian_development_bankRadio Free Europe/Radio Liberty
April 9, 2016

The Asian Development Bank is confident that it can overcome by 2020 the challenges of building a $10-billion gas pipeline through Afghanistan’s most violent areas.

Shareholders of the planned Turkmenistan, Afghanistan, Pakistan and India (TAPI) project agreed on April 7 to invest $200 million in studies and engineering for the $10 billion project.

The proposed underground pipeline will go through the southern province of Helmand, one of the most violence-hit in the country.

Sean O’Sullivan, the Central and West Asia director general of the ADB, an adviser for the project, said on April 8 that, despite the challenges, the project is “doable.”

“If it happens, it will be quite an unprecedented example of regional cooperation, particularly in a region that finds it difficult to cooperate,” he said in an interview with the Reuters news agency.

Under current timelines, the pipeline could be operational by 2020.

Based on reporting by Reuters

Copyright (c) 2016. RFE/RL, Inc. Reprinted with the permission of Radio Free Europe/Radio Liberty, 1201 Connecticut Ave NW, Ste 400, Washington DC 20036.
Posted in Economic News | Tags: Turkmenistan-Afghanistan-Pakistan-India gas pipeline |
« US, Afghanistan Call on Taliban to Return to Peace Talks
Two blasts hit Kabul diplomatic area after Kerry visit »

Subscribe to the Afghanistan Online YouTube Channel

---

---

---

Get Yours!

Peace be with you

Afghan Dresses

© Afghan Online Press
  • About
  • Links To More News
  • Opinion
  • Poll